How long does it take to air-dry lumber?

The rule of thumb, and what actually moves it · last checked September 26, 2026.

The old sawyer's rule is about one year per inch of thickness — roughly a year for 4/4 (one-inch) boards, two years for 8/4. It's a starting point, not a promise: species, climate and how you stack it can swing that by months.

What changes the timeline

Where air-drying stops

Air-drying pulls lumber down to roughly 12–20% moisture, in balance with outdoor air. That's fine for outdoor and rough work. For indoor furniture you need 6–8%, which means a kiln or a long stint in a heated shop after the air-drying is done.

Stack it right

Bill the lumber you cut

Whether you sell green or dried, SawTally keeps a running board-foot tally per job and turns it into an invoice on the spot — so you charge for exactly what came off the mill. Free to start, stays on your phone.

Open the app free

General guidance from common drying practice; results vary by species and conditions. Not professional forestry advice.